ISA-18.2
Management of alarm systems for the process industries
ISA-18.2 alarm management explained: the alarm lifecycle, rationalization, priorities, commonly quoted alarm rates, and how it relates to IEC 62682.
Scope
ANSI/ISA-18.2 sets out how to design, run and maintain the alarm system of a process plant. Its aim is that every alarm tells the operator about an abnormal condition that needs a response, in time to make it. It does this through a lifecycle, from an alarm philosophy through rationalization and design to monitoring, change management and audit.
On oil and gas facilities it applies to the alarms in the control system and the safety systems shown to the control room operator. It is used to clean up nuisance alarms, to deal with alarm floods during upsets, and to set priorities that match the consequence and the time the operator has.
IEC 62682 is the international standard on the same subject and was developed from ISA-18.2. EEMUA 191, from the UK-based Engineering Equipment and Materials Users Association, is a widely used guide. ISA-18.2 does not cover the design of the displays themselves, which is ISA-101, or the safety instrumented functions behind some alarms, which is IEC 61511.
The alarm management lifecycle
The standard describes ten stages. They form a loop, so the work never really ends while the plant runs.
- 1
Philosophy
A document that sets how the site defines, prioritises, designs and manages alarms. Everything else follows from it.
- 2
Identification
Possible alarms are found from HAZOPs, LOPA, incident reviews, operating procedures and the existing system.
- 3
Rationalization
Each alarm is checked against the philosophy. It is kept only if it needs an operator action, and it is given a priority, a set point, a cause, a consequence and a response.
- 4
Detailed design
Set points, deadbands, delays, suppression logic and how the alarm is shown on the HMI are designed.
- 5
Implementation
The design is configured, tested and the operators trained.
- 6
Operation
The alarms are in use, with shelving and out-of-service alarms controlled by procedure.
- 7
Maintenance
Instruments behind the alarms are tested and repaired.
- 8
Monitoring and assessment
Alarm rates, floods, frequent alarms and standing alarms are measured against targets.
- 9
Management of change
Additions, removals and changes to alarms are reviewed and approved.
- 10
Audit
Periodic checks that the work follows the philosophy and the standard.
Commonly quoted performance targets
Alarm system performance is judged with a few measured numbers. The figures below are the ones most often quoted from the ISA-18.2 alarm performance metrics.
| Measure | Commonly quoted target |
|---|---|
| Average alarm rate per operator, very likely acceptable | About 1 per 10 minutes, quoted as about 150 per day |
| Average alarm rate per operator, maximum manageable | About 2 per 10 minutes, quoted as about 300 per day |
| Alarm flood | More than 10 alarms in 10 minutes |
| Time spent in flood | Less than about 1% |
| Priority split, three priorities | About 80% low, 15% medium, 5% high |
Commonly quoted values, not a copy of the standard. The per-day figures come from the 2009 edition. The current edition, ISA-18.2-2016, gives the rates per hour and per 10 minutes, and its metrics are recommendations, not requirements. Each site sets its own targets in its alarm philosophy.
Key concepts
- What counts as an alarm
- An alarm is an audible and visible signal that tells the operator about an abnormal condition that needs a response. A message that needs no action is not an alarm and belongs in an event log.
- Rationalization
- A team review of each alarm, usually with operations, process and control engineers. It is where most nuisance alarms are removed and where priorities are set from the consequence and the time to respond.
- Master alarm database
- The approved list of alarms with their set points, priorities, causes, consequences and responses. The control system configuration is checked against it.
- Nuisance alarms
- Chattering alarms that come and go, fleeting alarms and standing alarms that stay on for days all reduce operator trust. Deadbands, on and off delays and better set points remove most of them.
- Shelving and suppression
- Shelving lets an operator hide an alarm for a while under control. Suppression by design hides alarms that do not apply, such as low-flow alarms on a pump that is stopped.
- Highly managed alarms
- Safety alarms and some regulatory alarms need extra control over testing, shelving and change. The standard calls them highly managed alarms.
Questions
What is ISA 18.2?
ANSI/ISA-18.2 is the US standard for the management of alarm systems in the process industries. It defines an alarm, sets out a ten-stage lifecycle and describes how to rationalize, design, monitor and change alarms. The current edition is ISA-18.2-2016.
What is the difference between ISA-18.2 and EEMUA 191?
ISA-18.2 is a standard with requirements. EEMUA 191 is a guide from the Engineering Equipment and Materials Users Association in the UK, first published in 1999, and it gives detailed guidance and benchmark figures. Many alarm philosophies refer to both.
Is ISA-18.2 the same as IEC 62682?
IEC 62682 is the international standard on alarm management and was developed from ISA-18.2, so the content is closely aligned. The IEC webstore lists edition 2.0 of 2022 as current. ISA has started a project for an identical adoption of IEC 62682 as the next ISA-18.2 and names a 2025 edition, so check the IEC catalogue and which document your project names.
What is an alarm flood?
A period when alarms arrive faster than an operator can deal with them. The commonly quoted threshold, from EEMUA 191, is more than 10 new alarms in 10 minutes for one operator. Floods usually happen during upsets and trips, which is when the operator needs the alarm system most.
In Deck Twin
No component cites ISA-18.2. The control console, video wall and alarm beacon are where alarms are shown and annunciated, and the console screens are drawn in an ISA-101 style. The library draws the hardware and static screens. It does not hold an alarm database or measure alarm rates.
Deck Twin uses these standards as reference values for visualisation. Check the current edition of each standard before using any value for design, procurement or fabrication.